• No propping is required
  • Only a 40mm levelling screed is required over the slab in most cases, however a structural topping may be required from time to time, depending on the loads.
  • Mesh to be used on external areas such as walkways, balconies and staircase landings as these areas are exposed to weather conditions (expansion and contraction)
  • Mesh to be used internally in areas greater than 16 m2
  • Expansion joints to be utilised in tiled areas (specifications are available from Elematic).
  • Spans of up to 11m are possible with a 250mm deep slab.with a structural topping.
  • Canterlevers can be provided when using Elematic hollow core concrete slabs.